Email: info@merryking.com
Home/Categories/POE Power Adapters/MK-P (POE Power Adapters)
POE Power Adapters MK-P (POE Power Adapters) - MK-P — image 1

POE Power Adapters MK-P (POE Power Adapters) - MK-P

Product Variants

Specifications

input
100-240V~50/60Hz 0.8A
output
24-48Vdc, 10-750mA, 36W Max.
AC plug
EU/KC/UK/AU/US/JP/AR/CN
DC plug
POE Port + LAN Port
certifications
UL, CE, FCC, GS, KC, KCC, UKCA, cUL, ETL, SAA, C-Tick, RCM, PSE, S-mark, CCC, EAC, CB, BIS, PSB, BSMI

Specification Details

MK-P specifications
ParameterValue
Input100-240V~50/60Hz 0.8A
Output24-48Vdc, 10-750mA, 36W Max.
AC PlugEU/UK
DC Plug / PortPOE Port + LAN Port
DC Wire—
CertificationCE, GS, KC, KCC, UKCA, UL cUL, ETL, FCC, SAA, C-Tick, RCM, PSE, S-mark, CCC, EAC, CB, BIS, PSB, BSMI

OEM / ODM Solutions

  1. Power adapter: Mold Design

    Mold Design

  2. Power adapter: Custom Silk-Screen Printing

    Custom Silk-Screen Printing

  3. Power adapter: Custom Packaging

    Custom Packaging

  4. Power adapter: Custom Length

    Custom Length

  5. Power adapter: Custom Colors

    Custom Colors

  6. Power adapter: Different AC Plugs

    Different AC Plugs

  7. Power adapter: DC Plug Customization

    DC Plug Customization

  8. Power adapter: Custom Output

    Custom Output

Order-to-Delivery Process

Order-to-delivery process step 01
Order-to-delivery process step 02
Order-to-delivery process step 03

1. Inquiry Received

Initial client consultation with our sales team; we confirm project requirements.

2. Engineering Review

Our engineers analyze the proposed product specifications.

3. Sampling & Quotation

Sales discusses prototyping and pricing with the client.

Order-to-delivery process step 04
Order-to-delivery process step 05
Order-to-delivery process step 06

4. Order Confirmed

Client approves samples, passes testing, and places the order.

5. Pilot Run & Packaging Design

Small-batch trial production begins, alongside custom packaging development.

6. Mass Production

Full-scale manufacturing starts after pilot run approval.

Order-to-delivery process step 07
Order-to-delivery process step 08
Order-to-delivery process step 09

7. Quality Inspection

Comprehensive QC checks during and after production.

8. Packaging

Finished products are packed according to client requirements.

9. Shipping

Goods are container-loaded and dispatched for delivery.

Product FAQ